READY FOR 6 MORE WEEKS OF WINTER? — Cloacina | Revolutionary Package Wastewater Treatment Systems

FOR TECHNICAL SUPPORT OR TO REQUEST PARTS, PLEASE CLICK HERE

Please note: This website includes an accessibility system. Press Control-F11 to adjust the website to people with visual disabilities who are using a screen reader; Press Control-F10 to open an accessibility menu.
CookieBot
Zoom Info code injection

READY FOR 6 MORE WEEKS OF WINTER?

Do you need a package wastewater treatment system that can withstand six more weeks of winter? 

Cloacina works with clients that need treatment options for extreme cold weather conditions.  All Cloacina models include options for:

  • Insulation of hydraulic piping under 2”

  • Installation of tanks outside with the equipment skid in an enclosed building 

  • Installation of the entire system indoors with sufficient clearance for operations and maintenance