ALL CLOACINA PACKAGE PLANTS AND EQUIPMENT UNDERGO RIGOROUS FACTORY ACCEPTANCE TESTING AS A COMPLETE SYSTEM PRIOR TO SHIPPING:
Tankage is cleaned and leak tested
All welds on the tankage are brushed and free of spatter and slag
All welds are cleaned and passivated through an electrochemical passivation process
Equipment is bump tested for functionality
Flow testing for pump rotation and leaks
All equipment is electrically tested and the results are recorded
Sensors are tested and calibrated
Membranes are tested
The controls system is tested in both manual and automatic modes
The controls system alarms, trending, notifications and setpoints are verified and recorded
All manual processes are performed and adjusted for easy operation
Equipment serial numbers are recorded
All factory setpoints are recorded
The system is cleaned and prepared for shipping