DESIGN PARAMETERS
PROJECT TEAM
OVERVIEW
This was a design/build project with Fluid Resource Management (FRM) and other sub-contractors, and was initially planned as a brand new treatment facility for the San Diego Zoo Safari Park. Cloacina proactively engaged with the client to offer best value solutions that maintained a high level of quality. Cloacina's scope included providing equipment for repurposing the existing aeration basin into an equalization storage basin, a MEMPAC-M package treatment plant with UV disinfection and a DRYPAC Aerated Sludge Handling System, all with fully integrated controls including remote monitoring and alarming.
CLOACINA SUPPLIED THE
FOLLOWING FOR THIS PROJECT: