These are the minds responsible for taking approved bid documents and conceptuals and turning them into full plan sets, process and instrumentation diagrams, process flow diagrams and 3-D models. The Cloacina Design Team is made up of engineers, draftsman and project managers. Their designs are innovative and their submittals are thorough. They understand the need to integrate the proposed Cloacina wastewater plant into site infrastructure and equipment. The Design Team prides themselves on value engineering each project to streamline construction and installation and save the client money.

CLOACINA PRE-PACKAGED HEADWORKS SYSTEM COMING SOON TO GEORGIA!

Anyone who has ever had to pull jewelry, bathing suit tops, flags or rubber duckies out of wastewater equipment, especially at 3:00 in the morning as part of an emergency callout, understands the importance of proper screening at the pre-package headworks of a treatment system.

Cloacina has partnered with Duperon, a wastewater equipment manufacturer, to provide pre-packaged headworks screening system for the Riverbend Environmental Complex in Ball Ground, GA.   Located in Cherokee County, this screening system will remove the large inorganic material that can cause costly damage to the downstream wastewater treatment equipment.

The Cloacina headworks system is manufactured and fully-assembled at the factory, including integrated screens, which allows for quick installation and saves money in engineering, construction and on-site mechanical installation costs.

COMING SOON TO THE WINE COUNTRY INDUSTRIAL PARK IN SONOMA!

The Wine Country Industrial Park in Sonoma, CA ordered a 30,000 Gallons per Day (GPD) Mempac™ Industrial Package Wastewater Treatment Plant. The property owner has multiple winery tenants and the Mempac-I will allow process waste from the tenants’ production to meet sanitary sewer discharge requirements. This is the first Mempac™- I to be installed in Sonoma and will be commissioned before crush.

90 DAY CONSTRUCTION SCHEDULE!

Nearing completion on the factory floor is a 25,000 Gallons per Day (GPD) Mempac™ – Industrial wastewater treatment plant for a winery in Livermore, CA. A typical construction schedule for a 25,000 GPD Mempac™ is five months; however, the client needed that timeframe reduced by 60 days. Cloacina is fabricating, construction, assembling, upfitting and wet testing this plant, including all ancillary equipment and the SCADA/controls system, in approximately 90 days! This system also has integrated nitrogen reduction, sludge handling and equalization equipment.